← All regulations
ARERA regulation · In force

BTVE tariff: charging infrastructure requirements

The dedicated tariff is not automatic and does not eliminate costs: requirements introduced from 1 July 2025.

StatusNew requirements from 1 July 2025Applies toOperators of publicly accessible, low-voltage charging infrastructure

ARERA updated BTVE tariff conditions. It may concern low-voltage PODs exclusively supplying publicly accessible charging infrastructure, compliant with PUN obligations and referenced AFIR provisions.

Essential requirements

  • Low-voltage supply.
  • POD exclusively dedicated to charging infrastructure.
  • Publicly accessible infrastructure.
  • Compliance with PUN information obligations.
  • Compliance with AFIR provisions cited by ARERA.

What a single-part structure means

BTVE links regulated tariff components to energy drawn. It does not make energy free or indiscriminately remove network, metering, tax or other applicable amounts.

PUN and POD are different procedures

PUN charger registration is one requirement to check. A dedicated POD must be requested through competent parties and meet the exclusive-use requirement.