Consistent information
Infrastructure data organised in the national format.
MeCharge checks your station information, flags missing fields and prepares the JSON file for bulk upload to the PUN.
Register without a card and try real charging too. No automatic trial renewal; publication requires a contract and activation.
The PUN is Italy's National Single Platform for electric vehicle charging points. Established by the Ministry of the Environment and Energy Security and developed by GSE and RSE, it provides consistent information on infrastructure across Italy.
Citizens, businesses and public authorities can view charging-point locations, specifications and operators. Where available, the platform can also show station status and prices.
Infrastructure data organised in the national format.
Validated stations can be viewed in the PUN network and PUN Maps.
Users can identify the CPO responsible for the charging point.
PUN obligations concern publicly accessible charging infrastructure.
A station usable by the general public, even on private property and subject to access conditions or restrictions.
Examples: car parks, hotels, shopping centres, restaurants, service stations and roadside points.A charger reserved for a home, internal users or an area closed to the public should not automatically be treated as publicly accessible.
Each situation must be assessed according to use and access arrangements.The operator must keep infrastructure information updated and check the results of operations carried out in the PUN.
The platform reduces manual work when managing one or more installations.
MeCharge brings together the chargers in your organisation.
CPO code, EVSE IDs, connectors and existing information are automatically included.
The page highlights technical or operator data to complete before export.
Save and check infrastructure individually or in bulk.
Download one file with all stations ready for upload.
Upload the file to your PUN account and review the outcome in upload history.
MeCharge prepares and exports the JSON file. The operator uploads it through its own PUN account: this is not a direct automatic submission.
Connect compatible chargers, complete required information and prepare the PUN export from the same operational area.
A publicly accessible station may qualify for a dedicated POD electricity supply exclusively for charging. With a low-voltage connection and current requirements met, the supply holder may ask their electricity retailer to apply the BTVE tariff.
From 1 July 2025, correct PUN registration and compliance with applicable obligations are requirements to request or retain this tariff.
A new connection must be requested through the retailer, distributor and competent parties.
POD, low voltage, exclusive public charging use and compliance must be checked.
BTVE applies regulated components through a single-part structure tied to kWh drawn, rather than the usual fixed, capacity and energy components.
MASE Decree of 16 March 2023 on PUN operation; EU AFIR Regulation 2023/1804; ARERA Resolution 22/2025/R/eel and the consolidated transmission and distribution rules. Regulations and tariff conditions can change: each project must be checked with competent parties.
It is Italy's National Single Platform for charging points. It collects information about infrastructure in Italy and helps users identify points and operators.
Obligations concern publicly accessible infrastructure. A station on private property may qualify when open to the general public.
No. MeCharge checks and pre-fills data, flags missing information and generates the JSON file. The operator uploads it to its PUN account and checks the result.
Yes. Check multiple installations and download one file containing all ready stations, rather than entering them individually.
You need operator and location details, connector specifications, EVSE identifiers and other PUN-required data. MeCharge shows incomplete fields.
After successful upload, validation and PUN publication, data can be viewed in the national network and official PUN Maps app.
No, not automatically. A POD electricity supply must be requested through the competent parties. PUN registration is one relevant requirement when considering the BTVE tariff.
No. BTVE does not eliminate energy, network, metering or system charges. It uses a single-part structure for regulated components and applies only when requirements are met.
Register free, check available data and find out what information you need to complete.